Why We Never Leave A Roof Exposed Overnight
This article is adapted from Mikel Wallesen's video above.
Read the video transcript
When we tear a tile roof down to the deck, the underlayment is the only thing standing between your house and the sky. That is a big deal. A monsoon cell can build in an hour out here, and even on a calm week the desert will surprise you with wind or a stray shower overnight. So we have a rule on every tile job we run. We do not leave a customer's roof exposed overnight. Ever.
What "Exposed" Actually Means
A tile roof has two layers of protection. The tile you see from the street, and the underlayment underneath it. The tile sheds most of the water and takes the sun. The underlayment is the real waterproofing. When we pull the old tile off to replace failed underlayment, there is a window of time where the deck is either bare or only partially covered. That is what we call exposed. If it rains on a deck that is bare, or on underlayment that is not fully sealed and lapped, water finds its way into the wood, into the insulation, and eventually into your ceiling.
You do not want to find that out the hard way. We have seen what a single overnight storm can do to a house that was left open, and it is never a small repair.
How We Plan the Day So It Does Not Happen
The way we avoid this is not luck. It is planning. Before we ever pull a single tile off, we already know how much roof we can safely open up in one day, how many guys are on the crew, how much new underlayment we have staged, and how much tile we can get back up top before the sun goes down.
We break the roof into sections. We only strip what we know we can fully re-cover the same day. If the forecast changes on us, or if we hit something unexpected in the deck, we adjust the plan on the spot. That might mean stopping a strip early, or pushing to get one more section buttoned up before we call it. The goal is the same every time. When the crew leaves at the end of the day, every square foot we opened up is protected.
The Order We Work In
Here is roughly how the process runs on a re-underlayment job.
- We dispose of the old tile off the section we are working. Broken pieces get cleaned up, salvageable tile gets staged for reuse if the customer is keeping the same tile.
- We inspect the deck. Any rotten or soft wood gets replaced right then. You cannot lay new underlayment over bad decking and expect it to hold.
- We lay the new underlayment down, fully lapped and sealed the way it is supposed to be. This is the layer doing the real work, so we do not rush it.
- In the same push, we start loading the new tile back on top of the finished underlayment.
- Any section that is not going back under tile that day gets closed out weathertight before we leave.
That last step is the one people skip when they are trying to move fast. We do not skip it.
Why This Matters for a Homeowner
You never know with the climate out here. You never know with the weather. A clean forecast at 9 in the morning does not mean anything by 8 at night. The homeowner should not be the one lying in bed listening to wind and wondering if their attic is about to get soaked. That is our problem to solve, not yours.
So when you hire us for a tile re-underlayment or a full tile replacement, this is part of what you are paying for. Not just the material and the labor, but the discipline to run the job in a way that keeps your house dry from the first tile we pull to the last one we set.